PROJECTS – HEALTHCARE
Mercy Hospital for
women
$750k Reinstatement
After a flood event in the recovery unit of the hospital, our team were engaged to reinstate the affected areas of level 1. This included rebuilding the theatres, hallways, offices, lunchroom and kitchen, and reinstating the plumbing, electricals, and furnishings.
Alfred Centre
$50k Reinstatement
Works for this project were to cover the reinstatement of the male toilets located on level 6. We were required to ensure suitable engineering controls were put into place for isolations and infection prevention, prior to works commencing, and reinstated entire bathroom, including ceiling plaster, partitions, tiling and mirrors, as well as all electrical requirements reinstalled such as hand dryers, lights, signs and fire sprinklers reinstated to code.
Caulfield Hospital
$150k Renovation
This project covered the conversion of three independent living wings into Covid Wards as part of a renovation scope. This included widening doorways to meet ward compliance, and installation of bathroom pods and showers.
